new WOW().init();
01 Strict site selection
Skyworth has established perfect site selection standards, and systematically analyzes and judges key factors such as structural risk, environmental risk, wind pressure, and load to avoid risky housing. To the greatest extent, it is ensured that users can use it safely and at ease, and the power plant operates safely and efficiently during the entire life cycle of the power station.
02 Rigorous design
Skyworth follows national and international standards such as GB 50797, GB 19064, IEC 62548, IEC 63049, and fully considers the environmental factors of the power station construction site to establish a comprehensive, complete and systematic design standard and design scheme. Self-developed Revit automatic design software, strictly abide by the principle of "one design for one household", and provide users with comprehensive, rigorous, systematic and efficient customized design services.
03 Selection of high-quality materials
For the equipment and materials used in the construction of the power station, Skyworth follows the principle of "high standards and strict requirements", all equipment are purchased from domestic first-class brands, the equipment quality is excellent, the quality assurance is comprehensive, and the certification certificate issued by a well-qualified third-party testing agency At the same time, Skyworth has established a complete process supervision mechanism to supervise and supervise the equipment production process from the production materials, process requirements, production supervision, quality inspection and other links to ensure the quality of the equipment in an all-round way.
04 Construction Specifications
Skyworth has established a complete set of technical specifications for the construction process, supervises the process of each link, "emphasizes quality and strictly controls", and strives to have excellent quality in each link, and each power station is solid and reliable. At the same time, Skyworth pays attention to the technical training and training of construction personnel. Construction personnel must undergo systematic training and pass the assessment before taking up their jobs.
05 Comprehensive acceptance
Skyworth has established a set of comprehensive and systematic acceptance standards and established a number of key indicators in terms of construction quality, power generation capacity, compliance and other aspects. For problem power stations, "corrections must be made", and resolutely ensure that the quality of power station construction will not be compromised, comprehensively ensure that users' power generation income will not be damaged, and the power station operation will be safe and risk-free.
06 Efficient operation and maintenance
The Skyworth operation and maintenance team provides operation and maintenance services for the whole life cycle of the power station, and establishes a complete set of systematic and comprehensive operation and maintenance solutions and technical requirements. By adopting the method of background monitoring + offline inspection, we strive to discover the operation and maintenance problems of the power station as soon as possible. Establish a long-term feedback mechanism, and respond to the abnormal operation of the power station as soon as possible. Establish an operation and maintenance performance evaluation mechanism, with monthly evaluations and annual evaluations, to fully ensure the user's power generation revenue and the safe and efficient operation of the power station.
In addition to the six high-standard station construction criteria, Skyworth Photovoltaic also insures the power station with comprehensive photovoltaic equipment insurance and three-party liability insurance in conjunction with PICC Property Insurance, which provides a guarantee for the long-term and good operation of the power station, thereby ensuring the benefits of users and effectively avoiding various problems. an unexpected risk of loss.
Sweep the official account